Oracle has long taken a hard-line stance toward virtualized environments, such as VMware vSphere. In Oracle’s view, most forms of server virtualization are considered “soft partitioning,” meaning they do not restrict the software’s licensing requirements. Oracle’s official Partitioning Policy document explicitly classifies technologies such as VMware ESXi and Microsoft Hyper-V as soft partitioning.

The policy states that soft partitioning methods are not permitted to limit the number of licenses required – you must license Oracle software as if it is running on the entire server (or cluster), not just the portion allocated to a VM. This position often surprises VMware administrators, as it diverges from how other software vendors license in virtual environments.

It’s important to understand that Oracle’s virtualization policy is vendor-driven (to protect Oracle’s license revenue) and is not automatically included in contracts – it’s a published guideline that Oracle uses during audits and negotiations. In practice, however, Oracle enforces this stance aggressively, expecting customers to license broadly in virtualized setups.

Licensing Requirements Across VMware Clusters

One key implication of Oracle’s policy is the requirement to license entire clusters of hosts when Oracle software is present on any virtual machine (VM) in the cluster. In a VMware cluster, hosts are pooled, and Oracle assumes an Oracle VM can run on any host in that cluster.

Therefore, according to Oracle’s policy, all processors on all physical servers in the cluster must be licensed if an Oracle workload is running anywhere in that cluster. It doesn’t matter if you intend to run Oracle on only one host – from Oracle’s perspective, the mere technical possibility of VM mobility means every host is a licensing liability.

For example, if you have a vSphere cluster of eight ESXi hosts, Oracle expects you to cover every host in that cluster with licenses when even a single Oracle Database VM exists in it.

This cluster-wide requirement can drastically increase the license count (and cost), especially in large, shared VMware farms. Oracle’s definition of “installed and/or running” software effectively extends to every host that can run the software, as part of the environment.

VMware vMotion and DRS: Hidden Licensing Risks

VMware’s vMotion (live migration) and Distributed Resource Scheduler (DRS) are powerful features that enable flexibility and high availability, but they are exactly what makes Oracle licensing on VMware so problematic. vMotion allows a running VM to move to another physical host.

DRS can automatically relocate virtual machines (VMs) across hosts for load balancing or during maintenance. From a licensing standpoint, if an Oracle Database VM can be moved via vMotion, then any host it can be landed on must be licensed for Oracle. Even if you initially run the Oracle VM on a single host, a DRS event or manual vMotion could unintentionally put it on an unlicensed host, creating an immediate compliance violation.

Oracle License Management Services (LMS) knows that vMotion means fluid placement of VMs, so they assume the worst-case scenario: at some point, your Oracle software might run on every host in the cluster. This risk is why a casual approach to using DRS with Oracle workloads can lead to huge licensing exposures.

Unless you’ve pre-licensed every host, vMotion/DRS features essentially make your entire cluster an Oracle scope. The safest course (short of full licensing) is to disable vMotion/DRS for Oracle VMs or isolate those VMs in their own cluster. Otherwise, the technical benefits of mobility come with a hefty licensing price tag.

No Acknowledgment of Affinity Rules or Technical Constraints

Many VMware administrators attempt to mitigate the impact of Oracle licenses by setting up technical controls, such as VMware’s Host Affinity rules to pin Oracle VMs to specific hosts or limiting the number of cores a VM can use. Unfortunately, Oracle refuses to recognize these measures as valid license boundaries.

You might create a “Must run on Host A only” rule for an Oracle VM, but Oracle will still treat the entire cluster (Host A plus any other hosts in the cluster) as the licensed environment. The reasoning is that such rules are easily changed or overridden and are not a permanent, hardware-based partition. Oracle’s partitioning policy explicitly disallows using software- or OS-based controls to reduce licensing requirements – this includes VMware DRS rules, CPU affinity settings, vSphere CPU pinning, or any similar configuration.

In Oracle’s eyes, these are all soft partitioning techniques. In practice, this means you cannot rely on VMware settings alone to stay compliant. Even if you meticulously keep an Oracle VM on one host, Oracle will argue that it could run elsewhere (and they often demand proof it never moved, which can be tricky).

The bottom line: Oracle does not accept purely virtual or software-defined control as a license limit. Only Oracle-approved hard partitioning (discussed next) or physical segregation truly count.

Soft Partitioning vs. Hard Partitioning

Oracle makes a clear distinction between “soft” and “hard” partitioning technologies, and this difference is at the heart of its virtualization licensing policies. Soft partitioning refers to any virtualization or resource allocation method that can be changed on the fly or does not physically tie software to a subset of hardware.

VMware vSphere, Microsoft Hyper-V, IBM LPAR with dynamic sharing, and most cloud hypervisors fall into this category. Soft partitioning is not accepted as a way to reduce license counts – if you use these, you must license the full physical environment.

Hard partitioning, on the other hand, means using a technology that physically or statically segments a server’s CPUs, such that an Oracle program is constrained to a fixed subset of CPU cores that cannot be changed casually.

Oracle does allow licensing to be limited to that subset if the partitioning method is one of their approved ones. In essence:

  • Soft partitioning = flexible, software-defined slices of hardware (Oracle demands full licensing of the server/cluster).
  • Hard partitioning = fixed, enforced hardware divisions (Oracle allows sub-capacity licensing in these cases).

The practical impact of this difference is huge. With soft partitioning (like VMware), a single Oracle VM might trigger licensing of dozens of cores across multiple servers. With an approved hard partitioning method, the same Oracle instance could be licensed for just 4 cores out of a larger server – legally saving costs. Understanding which category your virtualization falls into is critical for compliance. The table below summarizes examples of each:

Partitioning TypeExamplesOracle Licensing Treatment
Soft PartitioningVMware ESXi/vSphere; vCenter clusters;
Microsoft Hyper-V; IBM PowerVM with live mobility;
Linux cgroups; Dynamic OS resource managers
Not accepted for limiting licenses. Must license all CPUs in the entire server or cluster.
Hard PartitioningPhysical domain carving (e.g., Oracle Solaris PDomains);
Oracle Solaris Zones (capped);
IBM LPAR (capped, no dynamic moving);
Oracle VM Server or Oracle Linux KVM (with fixed vCPU pinning)
Approved for sub-capacity. Only the specified cores in the partition need licensing (if configured per Oracle’s guidelines).

Oracle-Approved Hard Partitioning Technologies

Oracle only accepts a short list of partitioning technologies as “hard” partitions for license purposes.

These include certain enterprise-grade virtualization methods that involve explicit, unchangeable resource caps.

Examples of Oracle-approved hard partitioning methods are:

  • Oracle VM Server (OVM) – Oracle’s hypervisor can be configured as a hard partition by statically assigning vCPUs to physical CPU cores, following Oracle’s documented procedure. Only the pinned cores need licenses, but you must follow Oracle’s OVM hard-partitioning guide and not use live migration outside the partition.
  • Oracle Linux KVM – Similar to OVM, if you use Oracle Linux’s KVM hypervisor and affinitize VMs to specific cores (per Oracle’s rules), Oracle will treat it as a hard partition. Oracle provides a document outlining how to set up KVM with CPU pinning so that it counts.
  • IBM Power LPAR (Logical Partitions) – Oracle accepts IBM PowerVM LPARs as hard partitions only if they are “capped” (meaning the LPAR cannot exceed a certain CPU capacity and no shared processor pool beyond that cap). Dynamic LPAR movements (DLPAR) or uncapped shared mode are not accepted because they would be soft. If properly capped, an LPAR running Oracle can be licensed to just its allocated cores.
  • Solaris Zones – Oracle Solaris OS features zones and containers. Oracle approves Solaris Zones as hard partitioning if they are configured as capped zones, where each zone has a fixed number of cores. This allows Oracle licenses to match the zone’s cores rather than the whole server.
  • Hardware Partitioning (Physical Domains) – Some high-end server hardware, such as Oracle’s own engineered systems, certain Fujitsu, IBM, or HPE systems, supports physically segmenting a box into separate partitions (sometimes referred to as PDomains, nPars, etc.). Oracle recognizes those hardware partitions as valid boundaries.

It’s crucial to note that only the specific technologies listed in Oracle’s policy are considered hard partitions. VMware vSphere is not on that list (nor are things like Microsoft’s Hyper-V or Amazon’s AWS VM instances), so no matter how you configure VMware, Oracle will treat it as soft partitioning.

If you require virtualization but want to limit Oracle licenses, you may need to consider using one of these approved methods instead of VMware for those particular Oracle workloads.

Each approved method often comes with strict configuration requirements and documentation – you’ll need to demonstrate compliance with Oracle’s guidelines if audited.

Example: Oracle on a 6-Host VMware Cluster
Consider a real-world scenario that illustrates the importance of the issue. Suppose your company runs an Oracle Database instance on a VMware cluster with 6 ESXi hosts. Each host has 2 CPUs, and each CPU has eight cores – that’s a total of 16 cores per host, or 96 physical cores across the cluster (6 × 16 = 96).

You create a VM for Oracle Database and give it 4 vCPUs, thinking that’s all the processing power the database will use. Under Oracle’s standard licensing (Processor metric), you might expect to need licenses for those 4 vCPUs (or the cores of the one host where it runs).

However, Oracle’s policy for soft partitioning reverses this expectation. Because the Oracle VM resides in a 6-host cluster, Oracle would insist that you license all 96 cores in that cluster for Oracle Database. It doesn’t matter that the VM is tiny or that it usually runs on only one physical server. In Oracle’s eyes, any of those 96 cores could potentially run the database, so all 96 must be fully licensed.

Now, let’s translate that into actual licenses. Oracle Database Enterprise Edition licensing is per core (using Oracle’s core factor table, typically an Intel core has a 0.5 factor, so 96 cores equals 48 licenses). You would need to own 48 processor licenses of Oracle Database Enterprise Edition (EE) for this single VM.

At current list prices, that could easily be several million dollars in licenses and annual support. This example highlights why running Oracle in a large VMware cluster can be costly if not planned correctly.

Many organizations have been caught off guard in audits, having only licensed one host or a subset of cores, only to be told they are out of compliance by tens of thousands of dollars per core. The lesson: if you put Oracle in a cluster, be prepared to license that entire cluster (or take steps to avoid this situation).

Architectural Strategies to Limit License Exposure

The best way to avoid unwelcome Oracle licensing surprises is through proactive architecture decisions.

Here are some approaches that can contain your Oracle licensing footprint in virtual environments:

  • Dedicated Oracle Clusters: Physically segregate Oracle workloads onto their own VMware cluster (or physical servers). By keeping Oracle VMs separate from general-purpose clusters, you limit the scope of required licensing. For instance, instead of running everything in a single 10-host cluster, carve out a 2-host cluster solely for Oracle databases. Yes, you’ll lose some flexibility, but you’ll dramatically reduce the number of hosts (and cores) you must license.
  • Minimize Cluster Size: If dedicated clusters are used for Oracle, keep them as small as possible. The fewer hosts in the Oracle cluster, the fewer total cores you need to license. It might be better to run two Oracle VMs on a single, fully licensed host than to spread them across two hosts in a cluster, which would require licensing both hosts. Weigh the high availability needs versus the licensing cost. Some organizations run Oracle on a single ESXi host with no vMotion at all. While this sacrifices automatic failover, it confines licensing to a single machine.
  • Disable vMotion/DRS for Oracle VMs: In VMware, it’s possible to turn off vMotion for specific VMs or avoid connecting Oracle clusters to vMotion networks. If an Oracle VM simply cannot move to other hosts (because you’ve isolated its network or storage), then effectively, you’ve contained where it can run. Be careful: Oracle may still not accept this as a formal limitation (since you could re-enable vMotion), but from a practical standpoint, it reduces the risk of accidental non-compliance. It’s wise to document such configurations thoroughly so you can show auditors that, operationally, the Oracle VM never moved.
  • Use Approved Hard Partitioning if Possible: If your infrastructure or performance requirements allow, consider using an Oracle-approved hard partition technology for Oracle workloads instead of VMware. For example, you might run Oracle databases on Oracle Linux KVM with strict CPU pinning, or use Oracle’s own OVM hypervisor for those servers. This allows you to license only what Oracle VM uses. The trade-off is reduced flexibility and possibly introducing a different virtualization stack just for Oracle. Make sure to follow Oracle’s configuration guidelines to the letter if you go this route.
  • Cloud and Engineered Systems: In some cases, moving Oracle workloads to Oracle’s own cloud or Oracle Engineered Systems, such as Oracle Exadata or Oracle Private Cloud Appliance, can simplify licensing. Oracle tends to offer more straightforward licensing terms in these scenarios (for example, Oracle Cloud has license-inclusive options or BYOL with predictable boundaries). However, this is a major architectural decision and may not suit every organization. The key point is to avoid sprawling Oracle deployments on infrastructures that Oracle doesn’t natively support, unless you’re prepared to pay for full capacity.
  • Review and Adjust Over Time: Regularly review your virtual infrastructure. If new hosts are added to an Oracle cluster, that expands your license requirements. If Oracle VMs are created or moved, ensure they remain in the designated contained environment. Sometimes IT teams unknowingly violate internal policy (e.g., moving an Oracle VM into a general cluster to deal with a hardware issue) – one quick fix like that can cascade into a massive license exposure. Communicate clearly with virtualization administrators about the importance of keeping Oracle contained.

By implementing such strategies, you can significantly reduce the risk of non-compliance or unexpected costs.

Essentially, you want to either technically prevent Oracle workloads from drifting into unlicensed territory or structurally isolate them so that Oracle’s policies only apply to a limited set of hardware.

CPU-Based Licensing Implications

Oracle’s licensing for databases and most of its software is based on physical CPU cores, so the structure of your VMware environment directly affects how many cores you’re on the hook to license.

Under the Processor License metric, Oracle counts each core (with a core factor applied) on every processor where the software is installed or running. In a non-virtualized scenario, this simply means “how many cores in the server running Oracle?” But in a virtualized VMware scenario, because Oracle treats a cluster or host group as the realm, the count of cores can multiply quickly.

For example, if each host has 20 cores and you have five hosts in scope, that’s 100 cores to license. Oracle does publish a core factor table; for instance, Intel Xeon cores often have a 0.5 factor, effectively requiring one license per two cores.

Even with that factor, the license requirement in large clusters is enormous. Processor-based licensing in Oracle assumes full usage of the hardware unless you have an approved means to limit it (which, as discussed, VMware is not).

It’s also worth noting that Oracle’s standard contracts do not include special terms for virtualization – there is no concept of licensing per VM or vCPU in Oracle’s license agreement. It’s always tied to physical processors.

This is why a misunderstanding of the rules leads companies to only count vCPUs (e.g., “our Oracle VM has four vCPUs, so four cores require licensing”). In reality, Oracle doesn’t sell a license for “4 vCPUs”; they sell per physical core (with factors). So if those vCPUs run on a host with many cores, Oracle will count the whole host or cluster.

The implication for budgeting is clear: if you want to virtualize Oracle, you must budget for the possibility of licensing a lot more hardware than the workload seems to use. Always calculate the worst-case core count and factor that into the cost of any virtualization project involving Oracle software.

Many organizations perform a cost analysis comparing a dedicated physical server (licensed for its cores) vs. a virtual cluster approach (licensed for all cluster cores).

Often, that analysis shows that keeping Oracle on fewer, perhaps larger, physical machines is more cost-effective than freely spreading it across a big virtual environment.

Myths and Misconceptions

Oracle licensing on VMware is rife with misconceptions that can lure IT teams into a false sense of compliance. It’s essential to clarify these myths:

  • “You only have to license the server where the VM runs.” This is the most common misunderstanding. Administrators assume that if an Oracle database is on Host A, only Host A’s cores need licensing. Oracle’s policy, however, dictates that if Host A is in a cluster with Hosts B, C, etc., then all hosts in that cluster must be licensed. The belief that licenses follow the VM’s current location is false in Oracle’s world – they also follow potential locations.
  • “Setting a VM-to-Host affinity rule is an acceptable compliance strategy.” While technically you can pin a VM to a single host in VMware, Oracle does not consider this a valid method for reducing licensing. They treat it just like any soft partitioning: a nice-to-have constraint but not binding on their license requirements. Relying on affinity without additional measures (such as physically isolating the host or licensing the entire cluster) is a dangerous strategy. In an audit, Oracle can and will ignore those rules.
  • “If the Oracle VM isn’t using resources on other hosts, I don’t have to pay for them.” This is a logical thought – why pay for capacity you’re not using? Unfortunately, Oracle’s stance is about what could be used or where the software could run, not actual usage. Your Oracle VM might be 100% pinned to 4 cores on one host today, but Oracle will argue that the program is technically installable or runnable on any core in the environment. Actual usage metrics or utilization percentages have no bearing on Oracle licensing requirements. It’s a capacity-based model, not a usage-based one.
  • “We can have an unlicensed disaster recovery host as long as it’s idle.” Oracle has specific rules for disaster recovery and failover. Generally, suppose a standby database is truly idle (not opened for use except during failover tests) and is used for less than 10 days in total per year. In that case, Oracle doesn’t require a separate license for it. However, in a VMware context, it’s easy to blur the lines between a DR instance and a running instance, especially if using automated site recovery tools. If the DR environment is a VMware cluster that’s connected or can host the Oracle VM, Oracle might demand it be licensed. The 10-day rule applies to specific types of failover setups and must be carefully followed and documented. Don’t assume a DR VMware cluster is free – clarify the usage and consider licensing it or keeping it truly isolated and powered off except in emergencies.
  • “Oracle won’t find out – we can just quietly restrict the VM and not tell them.” Counting on obscurity or a lack of audit is a risky game. Oracle audits are relatively common (especially for large customers), and they often specifically scrutinize virtualization. Oracle auditors may request documentation for vCenter, cluster configurations, or even network diagrams. While you’re not obligated to hand over everything they ask for, it’s hard to completely hide a virtualization setup if Oracle is digging. Additionally, during an audit you typically have to attest where Oracle software is installed or running. Providing false or misleading information could have serious legal consequences. It’s far better to address the issue upfront than to hope to fly under the radar.

By dispelling these myths internally, IT and software asset managers can make informed plans and avoid making decisions based on false assumptions. Oracle’s policies may be unwelcome or seem unfair, but misunderstanding them will only make matters worse.

Oracle Audits in Virtualized Environments

When it comes to license audits, Oracle’s approach to virtualized environments is notoriously tough. Oracle auditors (often from LMS or third-party firms Oracle hires) will usually examine your infrastructure closely if they know you run Oracle on VMware or other hypervisors.

Expect an audit to include detailed questions about where each Oracle product is installed and how your VMware clusters are configured. A common scenario is Oracle requesting a list of all VMware hosts and clusters, and whether they can run Oracle workloads.

They might even request access to vCenter logs or configurations to verify where Oracle VMs have resided. This is where having a well-documented, contained architecture (as recommended above) is vital. If you can delineate, for example, “Oracle is only installed on these two hosts, which form an isolated cluster, with no connectivity to other clusters,” it puts you in a stronger position.

However, many customers don’t realize the extent of Oracle’s interpretation until an audit happens. Oracle’s auditors often come armed with the Partitioning Policy document and will assert that you owe licenses for entire clusters or even multiple clusters if vMotion between them was possible.

They might cite examples of VMs moving (if they have logs) or simply use the policy as justification. It’s important to remember (and politely point out, if needed) that the Partitioning Policy is not a contractual document. You must comply with the license agreement (OLS – Oracle License and Services Agreement or a similar one), which typically states that you must license each processor on which the software is installed and/or running.

That clause can be interpreted more narrowly (i.e., only the hosts where you intentionally run Oracle). Some companies in audits have successfully pushed back, arguing that they had sufficient controls to ensure the software never ran on unlicensed hosts. But mounting such a defense requires solid evidence, expert help, and often a willingness to stand up to Oracle’s claims.

In reality, many audit outcomes end up in settlement negotiations where Oracle leverages the ambiguity to sell more licenses or an Unlimited License Agreement (ULA). The complexity of virtualization gives Oracle a strong hand – unless the customer is very prepared, it’s hard to definitively prove a negative (that no unlicensed running ever occurred).

As a result, most customers prefer to avoid being in a grey area altogether by adhering to Oracle’s known expectations. From an auditor’s perspective, if they find Oracle on VMware with no clear full licensing of the environment, it’s usually a quick path to citing a compliance gap.

Thus, the best defense in an Oracle audit is a well-thought-out deployment that either complies with Oracle’s conservative rules or is documented in a way that you can demonstrate control.

It’s also wise for organizations to engage independent licensing experts or legal counsel during Oracle audits involving virtualization, as the stakes are high – the difference between Oracle’s interpretation and a more literal contract interpretation can be millions of dollars.

Recommendations

For IT architects and Software Asset Management professionals dealing with Oracle on VMware, here are actionable recommendations to stay compliant and cost-effective:

  • Architect with Oracle in Mind: Before deploying Oracle in a virtual environment, design your infrastructure to limit Oracle’s reach. Use dedicated clusters or hosts for Oracle workloads whenever possible. Avoid mixing Oracle and non-Oracle workloads in large clusters.
  • Limit Cluster Scope: Keep Oracle clusters small. Use the minimum number of hosts needed to meet performance and availability requirements. Fewer hosts = fewer cores to license. Scaling up a single host with more RAM and CPU is often better than scaling out to multiple hosts, from a licensing standpoint.
  • Restrict VM Mobility: Disable or strictly control vMotion and DRS for Oracle VMs. If you need high availability, consider using VMware’s “Disabled DRS” for that cluster and implementing manual vMotion procedures under change control. The goal is to prevent Oracle VMs from roaming into unlicensed hardware. Document these restrictions so you can show auditors your controls.
  • Avoid Unapproved Partitioning Tricks: Don’t rely on VMware CPU affinity, host pinning, or similar soft controls as your only licensing protection – Oracle won’t accept them. If you use such methods internally, treat them as additional safeguards but still license as if they weren’t there (or isolate the environment).
  • Explore Hard Partitioning Options: If virtualization is required and you need to limit licenses, evaluate Oracle’s hard partitioning solutions. For example, running Oracle databases on Oracle Linux KVM with proper vCPU pinning might fit your use case. Ensure that any such implementation follows Oracle’s published guidelines exactly and maintains documentation, such as screenshots of CPU binding configurations, to prove compliance.
  • Consider License Impact in DR Plans: If you have a disaster recovery site or use VMware Site Recovery Manager, factor in Oracle licensing. An active-passive setup may still require licenses, even if it meets Oracle’s spare usage policies. You might choose to license the DR environment for safety, or architect it so that the DR Oracle instances are cold standby (powered-off VMs that are only activated during disasters). Keep logs of DR tests to track the 10-day rule if you’re using it.
  • Educate Stakeholders: Make sure your VMware admins, DBAs, and procurement teams understand Oracle’s licensing stance. Often, well-meaning IT staff might vMotion a database or add a host to a cluster without realizing the compliance impact. Regular training or at least clear internal documentation can prevent costly mistakes born of ignorance.
  • Monitor and Audit Your Environment: Proactively audit your own VMware environment for Oracle exposure. Verify that Oracle VMs haven’t drifted outside approved boundaries. Use vCenter tags or naming conventions to label Oracle VMs and hosts, making them easier to track. If you find any deviation (e.g., someone moved an Oracle VM to an unlicensed host temporarily), address it immediately and document the incident in case it comes up in an audit.
  • Negotiate with Awareness: If you’re in discussions with Oracle (whether during an audit or before a major purchase), be aware of their likely stance on virtualization. Arm yourself with your contract terms and, if needed, seek expert help. Do not simply accept the first compliance claim if it doesn’t align with your contract. That said, balance the cost of a legal fight versus the cost of additional licenses – sometimes a compromise like a ULA or cloud transition can resolve a standoff more amicably.
  • Stay Informed: Oracle’s policies and the industry’s best practices around virtualization licensing are constantly evolving. Stay up to date with the latest guidance from reputable sources, such as licensing consultancies and Oracle user groups. VMware and Oracle often disagree officially, so look to independent Oracle licensing experts for interpretations. Knowing how others have handled audits or architected solutions can give you ideas to strengthen your stance.

By following these recommendations, IT and SAM professionals can better protect their organizations from Oracle licensing pitfalls. The overarching theme is caution and control: treat Oracle on VMware not as “just another app,” but as a special case where extra diligence in architecture and management pays off.

The goal is to enjoy the technical benefits of virtualization without falling into a license compliance trap set by Oracle’s unique rules.

Always remember that when it comes to Oracle, an ounce of prevention in planning can save a pound of cure (and a boatload of money) during audits or true-ups.

Do you want to know more about our Oracle Advisory Services?

Please enable JavaScript in your browser to complete this form.

Author

  • Fredrik Filipsson

    Fredrik Filipsson brings two decades of Oracle license management experience, including a nine-year tenure at Oracle and 11 years in Oracle license consulting. His expertise extends across leading IT corporations like IBM, enriching his profile with a broad spectrum of software and cloud projects. Filipsson's proficiency encompasses IBM, SAP, Microsoft, and Salesforce platforms, alongside significant involvement in Microsoft Copilot and AI initiatives, improving organizational efficiency.

    View all posts